The Klang Valley's rail network is really three separate systems sharing a map. Prasarana's Rapid Rail runs the LRT, MRT, Monorail and the new Shah Alam Line under one Touch 'n Go ticketing system and the MyRapid Pulse app. KTMB runs the KTM Komuter commuter lines, and Express Rail Link runs the airport trains — both ticketed separately. A cross-network trip means physically changing trains, and sometimes payment systems, at a shared station such as KL Sentral or Masjid Jamek.
- Three different operators run the network: Prasarana's Rapid Rail (LRT, MRT, Monorail, Shah Alam Line), KTMB (KTM Komuter), and Express Rail Link (airport trains) — not one unified company
- The Shah Alam Line (LRT3) opened to the public on 29 June 2026, becoming the network's newest line, with 20 of its planned 25 stations running so far
- KL Sentral is the busiest single interchange, connecting both KTM Komuter lines, the Monorail and the airport trains under one roof
- Masjid Jamek and Pasar Seni are the main interchange stations for switching between the LRT lines and the MRT Kajang Line in the city centre
- Touch 'n Go card, a contactless bank card, or the MyRapid Pulse app covers Rapid Rail's LRT, MRT and Monorail lines, but KTM Komuter and the airport line use separate ticketing
Who this applies to: Residents and visitors navigating Kuala Lumpur and the wider Klang Valley by public transport, and anyone planning a rail journey that crosses more than one line.
On this page
Look at a Klang Valley rail map for the first time and it reads like alphabet soup — MRT, LRT, KTM, ERL, a pink Monorail line, and since mid-2026 a brand new Shah Alam Line threaded through it all. The instinct is to treat it as one train system with a confusing number of colours. It isn’t. It is three separate networks, run by three different companies, that happen to cross paths at a handful of shared stations. Once you know which company runs what — and where the free-to-walk transfers actually are — getting around Kuala Lumpur without a car stops being intimidating and becomes routine.
Three operators, not one network
The single biggest misconception about Klang Valley rail is that it is run by one authority. It is not.
Rapid Rail Sdn Bhd, a subsidiary of the government-owned Prasarana Malaysia Berhad, operates the LRT lines, the two MRT lines, the KL Monorail, and — since June 2026 — the new Shah Alam Line. These are marketed together under the Rapid KL brand and share a common ticketing system.
KTM Berhad (KTMB), Malaysia’s national railway, separately operates the KTM Komuter commuter rail service, which uses its own conventional rail tracks rather than the elevated or underground guideways of the LRT and MRT.
Express Rail Link Sdn Bhd (ERL) runs the airport rail service — KLIA Ekspres and KLIA Transit — connecting KL Sentral to Kuala Lumpur International Airport, again as a separate company with its own tickets.
The practical effect: a Rapid KL travel card or app does not work on KTM Komuter or the airport train, and vice versa. Where the three systems meet is at a small number of interchange stations, chiefly KL Sentral.
The lines, at a glance
| Line | Type | Operator | Route | Length / stations |
|---|---|---|---|---|
| Kelana Jaya Line | LRT | Rapid Rail | Gombak – Putra Heights | 46.4 km, 37 stations |
| Ampang Line / Sri Petaling Line | LRT | Rapid Rail | Shared trunk through the city centre, branching to Ampang and to Putra Heights via Sri Petaling | 45.1 km, 36 stations combined |
| Shah Alam Line (LRT3) | LRT | Rapid Rail | Bandar Utama – Johan Setia, Klang | 37.8 km; 20 of 25 planned stations open (opened 29 June 2026) |
| Kajang Line | MRT | Rapid Rail | Kwasa Damansara – Kajang | Underground through central KL, elevated elsewhere |
| Putrajaya Line | MRT | Rapid Rail | Kwasa Damansara – Putrajaya Sentral | 57.7 km, 36 stations, 13.5 km underground |
| KL Monorail | Monorail | Rapid Rail | KL Sentral – Titiwangsa | 8.6 km, 11 stations |
| Seremban Line | KTM Komuter | KTMB | Batu Caves – Tampin/Pulau Sebang | 135 km |
| Port Klang Line | KTM Komuter | KTMB | Tanjung Malim – Port Klang | 131 km |
| KLIA Ekspres / KLIA Transit | Airport rail | Express Rail Link | KL Sentral – KLIA | Non-stop express and all-stops variants |
The MRT Kajang Line was the first MRT line to open in the Klang Valley, running underground beneath the city centre before rising onto elevated track towards Kajang. The Putrajaya Line, the second MRT line, runs a longer route with the largest underground stretch of any line in the network. Both were built and are asset-owned through the wider MRT programme, with Rapid Rail handling day-to-day operations.
The Shah Alam Line is the newest addition to the map: it opened to passengers on 29 June 2026, becoming the network’s fourth fully automated, driverless rail system after the Kelana Jaya Line, the Ampang/Sri Petaling Line and the two MRT lines. Only 20 of its 25 planned stations were open at launch, with the remainder due by 2028 — so the western end of the network is still, quite literally, under construction.
Where the lines actually connect
Because each line was built by a different project team at a different time, interchange stations are not evenly spread — they cluster around a few points where the network was deliberately designed, or later retrofitted, to meet.
KL Sentral is the closest thing the Klang Valley has to a single hub. Both KTM Komuter lines call there, the KL Monorail begins there, and KLIA Ekspres/KLIA Transit terminate there — putting national rail, city rail and the airport line within one concourse.
Masjid Jamek, near the historic river confluence, is where the Kelana Jaya Line and the Ampang/Sri Petaling Line cross, making it a key transfer point for anyone moving between the two older LRT lines.
Pasar Seni is the main interchange between the MRT Kajang Line and the Kelana Jaya LRT line, useful for journeys that start on one system and need to finish on the other without detouring through KL Sentral.
Putra, Bank Negara and Kuala Lumpur stations are where the two KTM Komuter lines themselves cross over, letting Komuter passengers switch between the Seremban and Port Klang Lines without going all the way to KL Sentral.
Planning a journey across lines
For any trip confined to Rapid Rail’s own network — LRT, MRT, Monorail or the Shah Alam Line — a single Touch ‘n Go card, a contactless bank card tapped directly at the gate, or a token bought from a station machine carries a passenger across as many of those lines as the trip needs, with no separate ticket required at each interchange. The MyRapid Pulse app (Rapid KL’s official journey planner) covers exactly this set of services — MRT, LRT, Monorail, the Sunway BRT and Rapid KL’s feeder buses — with live arrival times and route planning.
The moment a journey needs KTM Komuter or the airport train, that convenience stops. Both are separate operators with separate fare media, so a Rapid KL card does not carry over, and the traveller instead buys a KTM Komuter ticket or an ERL ticket for that leg of the trip, tapping in and out at that operator’s own gates.
Common mistakes
- Assuming one card works everywhere. Touch ‘n Go and Rapid KL fare media cover the LRT/MRT/Monorail/Shah Alam Line group only — KTM Komuter and the airport trains are ticketed separately, even at a shared station like KL Sentral.
- Treating KL Sentral as a single platform. It is several stations — KTM Komuter, Monorail and ERL each have distinct concourses and gates under one roof, so a change of line still means walking, not just waiting on the same platform.
- Expecting the Shah Alam Line to be fully built out. As of its 2026 opening, five of its 25 planned stations were still under construction, so parts of the western route are not yet reachable by rail.
- Not checking which LRT branch a train is heading to. The Ampang and Sri Petaling Lines share track through the city centre before splitting at each end, so boarding the wrong branch train can add a long detour.
What’s next
For context on the city these lines serve, see NegaraKu.md’s guide to Kuala Lumpur as Malaysia’s federal capital, and Selangor, the surrounding state that most of the network — including the new Shah Alam Line — runs through.
Is there one ticket for the whole Klang Valley rail network?
No. Touch 'n Go and the MyRapid Pulse app cover Prasarana's Rapid Rail services — the LRT, MRT, Monorail and Shah Alam Line — as a single fare family, but KTM Komuter (run by KTMB) and KLIA Ekspres/KLIA Transit (run by Express Rail Link) are separate operators with their own ticketing, even where their trains share a station with Rapid Rail.
What is the difference between the LRT, the MRT and the Monorail?
All three are run by Prasarana's Rapid Rail subsidiary, but they are different systems: the Monorail is a short, older elevated line through the city centre; the LRT lines (Kelana Jaya, Ampang, Sri Petaling, and the new Shah Alam Line) are a mix of older and newer light rail routes; and the MRT lines (Kajang and Putrajaya) are the newest, highest-capacity routes, built with long underground sections through the city core.
Where do I change trains between the MRT and the LRT?
Pasar Seni is the main interchange between the MRT Kajang Line and the LRT Kelana Jaya Line. Merdeka and Bukit Bintang are further Kajang Line stations near other central interchanges. Masjid Jamek connects the Kelana Jaya Line with the Ampang and Sri Petaling Lines.
Does the airport train connect directly to the LRT or MRT?
The KLIA Ekspres and KLIA Transit trains, run by Express Rail Link, terminate at KL Sentral, where passengers can change on foot to KTM Komuter, the Monorail, and (via the Sentral concourse) the Kelana Jaya LRT line. There is no single ticket that spans the airport train and the Rapid Rail network.
The following are deliberately unstated or described only qualitatively until confirmed by a subject-matter expert:
- Confirm the final station count and total length of the Shah Alam Line (LRT3) once the remaining five planned stations open, expected by 2028.
- Confirm current MRT Kajang Line length/station count directly with MRT Corp or Rapid Rail before publication — Ministry of Transport and Rapid Rail's own line page give slightly different figures (51km/31 stations vs 46km/29 stations), which this article has avoided repeating verbatim pending reconciliation.
Sources
- Rapid KL — LRT (Kelana Jaya, Ampang and Sri Petaling Lines) — Prasarana Malaysia Berhad (MyRapid)
- Rapid KL — MRT Kajang Line — Prasarana Malaysia Berhad (MyRapid)
- Rapid KL — MRT Putrajaya Line — Prasarana Malaysia Berhad (MyRapid)
- Rapid KL — KL Monorail — Prasarana Malaysia Berhad (MyRapid)
- MyRapid Pulse — mobile app — Prasarana Malaysia Berhad (MyRapid)
- Rapid Rail — Prasarana subsidiary overview — Prasarana Malaysia Berhad
- KTM Komuter — Keretapi Tanah Melayu Berhad (KTMB)
- LRT Shah Alam Line (LRT3) — Mass Rapid Transit Corporation (MRT Corp)
- Current rail services — land transport infrastructure — Ministry of Transport Malaysia
- KLIA Ekspres / KLIA Transit — Express Rail Link Sdn Bhd (ERL)
Change history
| Version | Date | Change | By |
|---|---|---|---|
| 01.00 | 24 Jul 2026 | Approved and published. | — |