Renovations that affect the structure, floor area, layout or external appearance of a house — such as adding a kitchen, bathroom, roof or fence — require written permission from the Local Authority (PBT) under Section 70(1) of Act 133 before work begins. Minor interior work that does not touch the structure usually only needs a minor works permit. The CCC (Certificate of Completion and Compliance) is issued by the Principal Submitting Person, not the Local Authority, and confirms that the house has been built in accordance with the approved plans and is fit for occupation.
- Section 70(1) of Act 133 prohibits anyone from erecting a building without first obtaining written permission from the Local Authority.
- The CCC replaced the Certificate of Fitness for Occupation (CFO) from 12 April 2007 and is issued through a self-certification system.
- The CCC (Form F) can only be signed by the PSP after 21 Form G certificates are completed, including confirmations from external agencies such as the fire department, water and sewerage.
Who this applies to: Homeowners, property buyers and anyone planning renovation or extension work in Malaysia.
On this page
You want to add a kitchen at the back of the house or build an upper floor — and suddenly a neighbour says “you have to apply to the council first”. Is that true? For most renovation work, yes.
When does a home renovation need Local Authority approval?
The basic rule is clear. Under Section 70(1) of Act 133 (the Street, Drainage and Building Act 1974), no one may erect a building without first obtaining written permission from the Local Authority (PBT). “Building” here includes additions and alterations that affect the structure.
Generally, work is divided into three categories:
| Type of work | Examples | Approval required |
|---|---|---|
| Additions / structural | Kitchen, bathroom, roof, car canopy, fence, front wall additions | Local Authority building plan approval |
| Minor works | Repainting, retiling, wiring, cabinets, solar panels (roof structure remains) | Minor works permit (area limits vary by Local Authority) |
| Exempt | Interior painting, wallpaper, changing a door/pipe, decorative lighting, small fish pond | None, if the structure is not affected |
Bear in mind: the definition of “minor works” and any area limit distinguishing minor works from work requiring full approval are set by each Local Authority’s by-laws and can differ between councils. Check with your Local Authority for the exact figures before starting work.
For terraced houses, some Local Authorities provide a Standard Plan (Pelan Setara) — a standardised plan for kitchen, bathroom, roof or fence additions — so that owners can build directly without engaging a consultant. The condition is usually that the original wall may not be demolished or broken through. Availability of this scheme varies by Local Authority.
What is the Certificate of Completion and Compliance (CCC)?
The CCC is a document that confirms a building has been completed in accordance with the approved plans as well as Act 133 and the Uniform Building By-Laws 1984 (UBBL). It replaced the old Certificate of Fitness for Occupation (CFO) from 12 April 2007, the effective date on which the system switched to self-certification.
The key difference: the CCC is not issued by the Local Authority. It is issued by the Principal Submitting Person (PSP) — the architect, professional engineer or registered building draughtsman who submitted the original plans. The PSP signs Form F (full CCC) or Form F1 (staged CCC) only after 21 Form G certificates are completed. Some of the Form G certificates require confirmation from external agencies such as the fire department, water authority, sewerage and electricity supply.
The Local Authority’s role is now one of check and balance: carrying out inspections during construction and able to withhold the CCC if there is any non-compliance.
Why is the CCC important at key handover?
For buyers of a new home, the CCC is the official proof that the house is fit for occupation. Without the CCC, the building officially cannot yet be occupied, and utility connections can still be delayed. At key handover, ask the developer for a copy of the CCC (Form F/F1) and keep it — you will also need it later if you want to apply for a minor renovation permit for that house.
What are the penalties for renovating without approval?
Building without approval is no small matter. According to MBPJ’s guidance, the actions that may be imposed include a compound of up to RM25,000 for deviating from the approved plans, and a compound of up to RM50,000 for non-compliance, in addition to a stop-work order or a demolition order. Fees for unauthorised work may also be charged at up to 10 times the normal rate.
What’s next
- Check your Local Authority’s website (e.g. MBPJ, DBKL, MBSA) for the list of works requiring approval and the application forms.
- For structural additions, engage an architect or engineer to submit the plans through the One Stop Centre (OSC).
- When buying a new home, confirm the CCC status (Form F/F1) before key handover.
- Keep a copy of the CCC — you will need it for future renovation applications.
Does every home renovation need Local Authority approval?
No. Minor interior work that does not alter the structure — repainting, replacing tiles, installing cabinets — usually only needs a minor works permit or is exempt. But structural additions, kitchens, bathrooms, roofs and fences require building plan approval.
Who issues the CCC?
The Principal Submitting Person (PSP) — an architect, professional engineer or registered building draughtsman — not the Local Authority. The Local Authority acts as a check-and-balance body.
Why is the CCC important at key handover?
The CCC confirms that the house was built in accordance with the approved plans and is safe to occupy. Without the CCC, the building is officially not fit for occupation and utility supply can be affected.
The following are deliberately unstated or described only qualitatively until confirmed by a subject-matter expert:
- Had keluasan bagi 'kerja kecil'/permit kerja kecil berbeza mengikut PBT — sahkan angka sebenar (jika ada) dalam undang-undang kecil PBT berkenaan sebelum menyatakan sebarang nilai spesifik.
- Ketersediaan dan syarat 'Pelan Setara' untuk rumah teres berbeza mengikut PBT — sahkan dengan PBT berkaitan.
- Amaun kompaun (RM25,000 / RM50,000) dan fi sehingga 10 kali ganda diambil daripada panduan MBPJ — sahkan jadual semasa MBPJ dan bahawa nilai serupa terpakai di PBT lain.
Sources
- Certificate of Completion and Compliance (CCC) FAQ — Jabatan Kerajaan Tempatan (JKT), KPKT
- Soalan Lazim Jabatan Kawalan Bangunan — Majlis Bandaraya Petaling Jaya (MBPJ)
- Kelulusan Kerja — Panduan Pemilik Rumah — Lembaga Pembangunan Industri Pembinaan (CIDB)
- Law & Realty: Understanding the New CCC — Majlis Peguam Malaysia (Malaysian Bar)
Change history
| Version | Date | Change | By |
|---|---|---|---|
| 01.00 | 8 Aug 2026 | Approved and published. | — |