Home / Doing Business in Malaysia / Business / Doing business by location

🧭 Practical ✓ Published: 22 Jul 2026 9 min read Next review 22 Jul 2027

Malaysia's State and Corridor Investment Agencies — What Each One Can Actually Approve

A verified directory of Malaysia's state investment promotion agencies and statutory corridor authorities — the one document each state agency really controls, why the corridor authorities can only recommend incentives, and which official domains no longer resolve.

30-second answer Reviewed 22 Jul 2026

Malaysia's state investment agencies promote and facilitate but approve almost nothing. The one instrument they control is the No Objection Letter, which MIDA and MITI require from the state government before granting a manufacturing licence. The statutory corridor authorities — NCIA, ECERDC, IRDA, SEDIA and RECODA — are creatures of their own Acts, but their incentive power is expressly a power to recommend to the Federal Government, not to grant.

  • The No Objection Letter is the real state-level gate — MIDA will not issue a manufacturing licence without it
  • SEDIA's own enactment, s.7(f), limits it to recommending incentives to the Government or the Federal Government
  • NCIA says the same of itself — it recommends incentives, it does not award them
  • The NCER tax incentive package (NTAX) closed to new applications on 1 January 2025
  • InvestKL ceased independent operations — MIDA absorbed its functions on 15 March 2026
  • RECODA is at recoda.gov.my; recoda.com.my does not resolve. NCIA publishes at ncer.com.my; ncia.gov.my does not exist
  • Sabah and Sarawak run state investment agencies alongside their corridor authorities — Invest Sabah Berhad and InvestSarawak sit beside SEDIA and RECODA

Who this applies to: Founders and investors deciding which Malaysian state to site a project in, and which agency to approach first.

On this page
Full explanation ≈9 min

The agency everyone tells you to call first usually cannot approve the thing you need. That is not a criticism of the agencies — it is how the architecture is built. Malaysia’s investment approvals are federal. The states promote, facilitate, and hold exactly one card.

Knowing which card, and who holds it, saves months.

What can a state investment agency actually approve?

One document, in practice: the No Objection Letter.

InvestPenang states it plainly — the NOL is a mandatory document to obtain from InvestPenang before the Manufacturing License can be awarded by MITI/MIDA. Invest Selangor puts it the same way: MITI or MIDA requires the applicant to obtain a No Objection Letter from the Selangor State Government before the manufacturing licence can be granted.

So the sequence is not what most guides show. You do not get a state blessing and then apply federally. You apply to MIDA, receive a Letter of Manufacturing Licence Approval, and then go to the state for the NOL that unlocks it. Invest Selangor’s eligibility line is explicit: applicants are companies that have already received the MITI or MIDA approval letter, including an interim letter.

Everything else a state agency offers — site selection, utility introductions, talent programmes, aftercare — is facilitation. Valuable, unpriced, and not an approval.

Which agencies are real, and where do they publish?

Every domain below was tested directly in July 2026.

AgencyLegal formOfficial domainGating document
InvestPenang (Invest-in-Penang Berhad)Non-profit entity of the Penang State Government, established 5 November 2004investpenang.gov.myNOL, via enol.investpenang.gov.my
Invest Selangor BerhadCompanyinvestselangor.myNOL
Invest JohorJohor state investment promotion agencyinvestjohor.gov.myNOL
Invest Melaka BerhadCompanyinvestmelaka.gov.myNOL
InvestPerak (Perak Investment Management Centre)Established 24 January 2006, reports to the Chief Minister of Perakinvestperak.gov.myNOL
Invest Sabah BerhadCompanyinvestsabah.gov.mynot published
InvestSarawakSarawak state investment agencyinvestsarawak.gov.mynot published
InvestKLAbsorbed by MIDA, 15 March 2026no longer resolves

And the statutory corridor authorities, which are a different species — bodies corporate created by their own legislation:

AuthorityStatuteRegionOfficial domain
NCIAAct 687 (2008)Northern Corridor Economic Regionncer.com.my
ECERDCAct 688 (2008)Kelantan, Terengganu, Pahang, and Mersing and Segamat in Johorecerdc.com.my
IRDAAct 664 (2007)Iskandar Malaysiairda.com.my
SEDIASabah Economic Development and Investment Authority Enactment 2009Sabah Development Corridorsedia.com.my
RECODASarawak ordinance, current-series Cap. 64SCORErecoda.gov.my

Why can none of them grant you an incentive?

Because their own statutes say so, in terms.

The SEDIA enactment s.7 lists the Authority’s functions. Paragraph (f) is to recommend to the Government or the Federal Government incentives for the Sabah Development Corridor. Paragraph (c) is to coordinate the expeditious implementation of all projects in the Sabah Development Corridor by performing the functions of one-stop centre. Recommend and coordinate. Neither is grant. The Chairman is the Chief Minister (s.8(1)(a)), which tells you the body is a political coordinating mechanism, not a revenue authority.

NCIA describes itself identically — it can recommend to the relevant Government Entities on the incentives to be given to investors in NCER.

RECODA has no taxing power at all under ss.9–10 of its ordinance.

IRDA is co-chaired by the Prime Minister and the Menteri Besar of Johor, and calls itself the main coordinating agency between public and private stakeholders. Coordinating, again.

The actual grant is a federal act: an exemption under the Income Tax Act 1967, made by the Minister of Finance, on the recommendation of the National Committee on Investment. Most guides describe the corridors as if they hand out tax holidays. They hand out letters of support.

Which states are actually winning investment?

There is exactly one official, comparable, by-state series: Appendix 2 of MIDA’s Malaysia Investment Performance Report, Approved Investments in Various Economic Sectors by State. Approved investment, RM million:

State20252024
Johor110,031.147,846.1
Selangor83,916.4101,790.6
W.P. Kuala Lumpur63,262.789,209.6
Pulau Pinang32,877.631,986.9
Kedah27,791.247,985.3
Negeri Sembilan19,129.67,248.9
Perak15,755.38,758.6
Melaka14,685.18,263.8
Sabah14,550.06,457.8
Sarawak14,193.616,235.5
Pahang8,110.74,584.4
Terengganu7,580.7617.0
Kelantan1,643.82,157.7
W.P. Putrajaya863.01,258.7
W.P. Labuan472.0373.9
Perlis217.2126.8
Undecided11,656.99,478.5
Malaysia426,736.8384,380.1

Johor more than doubled and took the national lead, at roughly 26 per cent of approved investment. Selangor and Kuala Lumpur both fell in absolute terms, and Kedah fell by 42 per cent. That is the JS-SEZ and the data-centre wave showing up in the only place it can be checked.

Four cautions before you use this table.

MIDA publishes no by-state breakdown for services or primary sectors — only all-sectors, in Appendix 2, and manufacturing-only, in Appendix 10. Subtracting one from the other gives you a residual you calculated, not a MIDA figure.

MIDA does not state rank in words. The ordering above follows the appendix’s own row order; the ranking is inferred from it.

Never blend these with a state agency’s own numbers. InvestPenang, Invest Selangor, Invest Sabah and the rest publish on a different basis, often including state-level memoranda and projects MIDA never approved. Putting the two in one table would be actively misleading. If you cite a state agency figure, label the basis.

The totals are revised, repeatedly. The 2024 national figure was RM378,499.7 million in the 2024 report and RM384,380.1 million in the 2025 report’s comparative column, with individual state rows unchanged. And MIDA’s own revised quarterly table published in June 2026 puts 2025 at RM431,080.6 million, with Johor at RM110,050.6 million and Selangor at RM84,625.0 million — against the RM426,736.8 million headline used above. Pick one vintage and cite it consistently; do not mix them in a single calculation. The 2025 column above sums to RM426,736.9 million against a stated RM426,736.8 million, the 0.1 rounding difference the report itself warns about; the 2024 column sums exactly.

Manufacturing alone tells a different story. On MIDA’s manufacturing-only table for 2025, Johor takes RM24,577.1 million across 323 projects, Pulau Pinang RM22,375.4 million across 232 and Selangor RM18,137.3 million across 411. Penang is a close second in factories while placing fourth on all sectors — which is exactly what you would expect of a state whose economy is 47 per cent manufacturing. If your project is a plant rather than a data centre, the all-sectors league table is the wrong one to read.

What changed in 2025 and 2026?

Three things, and all three break older guidance.

NCER’s tax incentive package closed. NCIA’s own page states that the NTAX package will no longer be available for application, effective 1st January 2025, and that new incentives run through the National Committee on Investment instead. The historic rates it describes — 100% income tax exemption up to 15 years in zone N1 covering Kedah and Perlis, 70% up to 10 years in zone N2 covering Penang and Perak, cited to s.127(3A) of the Income Tax Act 1967 — are a record of what was available, not a menu.

ECER’s incentive orders lapsed. The 2016 ECER orders were extended only to 31 December 2024 by P.U.(A) 344–350/2023, and no later extension has been located in the gazette.

InvestKL ceased to exist as an agency. MIDA’s media release states that from 15 March 2026 it assumes InvestKL’s investment promotion and facilitation functions, that InvestKL ceases independent operations on absorption, and that the move eliminates institutional overlap.

Taken together: the corridor-incentive era that ran from 2007 has largely wound down into a single federal channel.

The exception that proves the point is JS-SEZ, which is the one corridor still expanding — MIDA records RM77.0 billion of approved investment across 393 projects and 18,406 employment opportunities in 2025, with a headline 5 per cent corporate rate for up to 15 years and 15 per cent personal tax for eligible knowledge workers for up to 10. But no rate order has been gazetted. A sweep of subsidiary legislation returns nothing for special economic zone, global services or ekonomi khas, and the guidelines for JS-SEZ, the National Global Services Hub and the New Investment Incentive Framework all say the rate is to be provided through subsidiary legislation under s.65B. These are administrative approvals with no claimable instrument behind them yet — worth knowing before a financial model treats the 5 per cent as a legal entitlement.

Which domains do not resolve?

This matters more than it sounds, because the wrong domain is how readers end up on a squatted or impersonating site.

  • investkl.gov.my — no longer resolves, consistent with the MIDA absorption.
  • ncia.gov.my — does not exist. NCIA publishes at ncer.com.my.
  • recoda.com.my — does not resolve. RECODA is at recoda.gov.my.
  • ecerdc.com.my — resolves only on the www host.
  • investkedah.com.my — resolves, but redirects to an unrelated commercial site. Do not treat it as a Kedah government channel.
  • sedia.com.my — live, but returns 403 to automated fetches; it serves normally to a browser.

Common mistakes

Treating the corridor authority as the decision-maker. It is a coordinating body with a recommending power. Budgeting a project on a corridor rate you have not traced to a gazetted order is how a financial model acquires a number that no one will honour.

Applying for the NOL before the MIDA approval letter. Invest Selangor’s own eligibility criterion is that you already hold the MITI or MIDA approval, interim letters included. Turning up early wastes a cycle.

Sending Forms 9, 24 and 49. Invest Selangor’s published NOL document list still asks for them. Those forms were abolished by the Companies Act 2016 — the current equivalents are the s.17 notice of registration, the s.78 return of allotment and the s.58 particulars of officers. Send the modern documents and a covering note; do not conclude the state cannot process your file.

Assuming every state has an agency. Six states have no separately branded investment agency whose domain could be verified. In those states the function typically sits with the state economic planning unit or the state development corporation. A consultant page listing sixteen tidy agency names is describing an org chart that does not exist.

Confusing the state agency with the corridor authority in Sabah and Sarawak. Both run in parallel: Invest Sabah Berhad alongside SEDIA, InvestSarawak alongside RECODA. They are not the same body and they do not have the same mandate.

What’s next

Work out which of the two tracks you are on. If you need a manufacturing licence, your critical path runs MIDA first, state agency second, and the NOL is the item to chase. If you are a services or digital business, the state agency is a courtesy call and MIDA or MDEC is the real counterparty.

Then price the location on things that are actually published — statutory employer costs, electricity, water, and port access — rather than on an incentive rate. Our companion pages on business costs by region, talent availability by region and infrastructure and connectivity by region set out what can be sourced officially, and say plainly where nothing can.

Frequently asked 5
Which agency should I approach first?

For a manufacturing project, the state investment promotion agency, because you will need its No Objection Letter before MIDA can issue the manufacturing licence. For a services or digital project, MIDA or MDEC directly — the state agency has no gating document for you. Approaching the corridor authority first is rarely wrong, but understand that it will route you onward rather than decide anything.

Can a corridor authority give me a tax incentive?

No. Read the statutes. The Sabah Economic Development and Investment Authority Enactment 2009 s.7(f) empowers SEDIA to recommend to the Government or the Federal Government incentives for the Sabah Development Corridor. NCIA describes its own function in the same terms. The grant itself is an exemption under the Income Tax Act 1967, made by the Minister of Finance, on the recommendation of the National Committee on Investment.

What is a No Objection Letter and who issues it?

It is a letter from the state government confirming it does not object to your project. InvestPenang states it is a mandatory document to obtain before the manufacturing licence can be awarded by MITI or MIDA. Invest Selangor, Invest Johor, Invest Melaka and InvestPerak all run their own NOL application channel. It is a state document, so the criteria and the forms differ state by state.

Is InvestKL still operating?

No. MIDA announced that from 15 March 2026 it assumes the investment promotion and facilitation functions of InvestKL Corporation, and that InvestKL ceases independent operations on absorption. Greater Kuala Lumpur is now handled by MIDA directly. Any guide still telling you to contact InvestKL, or citing investkl.gov.my, is out of date — the domain no longer resolves.

Do all thirteen states have an investment agency?

Not with equal capability, and not all with a verifiable web presence. Penang, Selangor, Johor, Melaka, Perak, Sabah and Sarawak run agencies whose official domains resolve and which publish an application channel. For several other states the investment function sits inside the state economic planning unit or the state development corporation rather than a separately branded agency. Do not assume a name you read on a consultant page corresponds to a real body.

Sources & history 10 sources
⚑ Awaiting expert verification

The following are deliberately unstated or described only qualitatively until confirmed by a subject-matter expert:

  • Confirm the current official investment promotion channel for Kedah, Pahang, Negeri Sembilan, Terengganu, Kelantan and Perlis — no separately branded agency domain could be verified for these states, and investkedah.com.my redirects to an unrelated commercial site
  • Confirm whether IRDA, ECERDC, NCIA, SEDIA or RECODA hold delegated expatriate-pass approving authority, and on what instrument
  • Confirm the No Objection Letter processing time and any fee for each state — none of the state agencies publishes a service standard or a fee on its NOL page
  • Confirm what replaced the NCER NTAX package for applications made from 1 January 2025, and whether any transitional relief applies to applications lodged before that date
  • Confirm the current statutory instrument governing RECODA — VERIFIED-SOURCES records that Sarawak runs two parallel chapter-numbering series and that the RECODA ordinance is current-series Cap. 64
  • The SEDIA enactment PDF hosted on sedia.com.my is watermarked FOR REFERENCE ONLY August 2010 — check the gazetted text for any amendment since
  • Reconcile MIDA's two published 2025 investment totals — RM426,736.8 million in the Investment Performance Report of March 2026 and RM431,080.6 million in the revised by-state table of June 2026
  • Confirm whether any subsidiary legislation has since been gazetted setting the JS-SEZ, National Global Services Hub or New Investment Incentive Framework rates under s.65B of the Income Tax Act 1967

Sources

  1. Malaysia Investment Performance Report 2025 — Appendix 2, Approved Investments by State — MIDA
  2. Approved Private Investments by State, January to March 2026 — MIDA
  3. MIDA Absorbs InvestKL Functions Effective 15 March 2026 — MIDA
  4. Sabah Economic Development and Investment Authority Enactment 2009 — SEDIA
  5. About NCIA — Northern Corridor Implementation Authority — NCIA
  6. NCER Tax Incentives (NTAXNCER) — NCIA
  7. East Coast Economic Region Development Council Act 2008 (Act 688) — ECERDC
  8. About IRDA — IRDA
  9. No Objection Letter (NOL) — InvestPenang
  10. No Objection Letter (NOL) — Selangor Business Hub — Invest Selangor Berhad

Change history

Version Date Change By
01.00 20 Jul 2026 Approved and published.
More in Doing business by location View all 14 →
Related knowledge
Malaysia's Economic Corridors Compared The five Malaysian economic corridors side by side — statutory authority, states covered, target sectors, headline incentive and the live application route as at July 2026. Johor-Singapore Special Economic Zone — Incentives, Conditions and Clawbacks What the Johor-Singapore Special Economic Zone incentive package actually grants, which flagship zone each incentive attaches to, and the compliance conditions that determine whether you keep the headline rate. Northern Corridor (NCER) — What NCIA Can Actually Give You The statutory limits on what the Northern Corridor Implementation Authority can offer, the closure of the NTAX incentive package, and why the semiconductor cluster in Kulim and Penang is not legally tied to NCER at all. East Coast Economic Region (ECER) — Gazetted Incentives, and Why Every Window Has Closed ECERDC's statutory basis, the eight gazetted 2016 incentive orders and the Kelantan and MCKIP schemes, the closed application windows, and where MCKIP, Kuantan Port and the ECRL actually stand. Doing Business in Sarawak — SCORE, State Licensing, State Immigration and the Land Code What is genuinely different about operating in Sarawak — the SCORE corridor and its power economics, three separate state licences instead of SSM registration, an immigration system the state controls, and a Land Code that bars most companies from most land. Which Malaysian Agency Approves What — and in What Order A directory of the agencies a foreign investor must deal with — MIDA, MITI, MDEC, KPDN, SSM, ESD, MyIPO and the regional corridor authorities — with what each one actually issues and the order to approach them in. Iskandar Malaysia and IRDA — What Survives Now the JS-SEZ Overlays It The gazetted Iskandar incentive orders, when each window actually closed, why Medini appears in no gazette at all, and what IRDA does today inside a JS-SEZ that covers the same ground. Manufacturing Licence and the ICA 1975 Exemption Who needs a manufacturing licence under the Industrial Co-ordination Act 1975, why the exemption test is stricter than the licensing test, and why an exempt SME still needs the ICA 10 confirmation letter to reach duty exemptions and incentives.